Project Description

Square Feet:
500,000

Overview:
The 1/2 million sq. ft. distribution facility project consisted of mechanical system design/build including rooftop gas/electric equipment, direct fired heating, evaporative cooling with relief and direct digial control BAS system.

There were over 100 pieces of mechanical equipment on this project. The equipment was set in place by a helicopter in less than six hours.